Last reviewed: September 2026
By Events Cookie Editorial Team
A real estate launch event is more than the formal introduction of a new property. It is a carefully managed sales and brand experience where a developer presents the project, builds buyer confidence, activates channel partners, generates enquiries and creates momentum for future site visits and bookings.
A professionally managed real estate launch event in India may begin at approximately ₹7 lakh for around 100 guests at a launch-ready venue. A premium 500-guest project launch with temporary infrastructure, elaborate branding, professional production and entertainment may cost ₹45 lakh–₹90 lakh or more. Large open-ground launches, multi-day programmes and celebrity-led events can exceed ₹1 crore.
These are broad 2026 planning estimates—not fixed market rates or confirmed quotations.
The final cost depends on:
-
Project location
-
Launch format
-
Number and profile of guests
-
Site readiness
-
Venue or open-ground requirements
-
Temporary structures
-
Stage and technical production
-
Project displays and branding
-
Catering and hospitality
-
Marketing and content
-
Lead-capture technology
-
Entertainment
-
Security and permissions
-
Weather protection
-
Event duration
Real estate launch event planning in India also requires careful coordination between the developer’s leadership, sales, marketing, legal, finance, construction and customer-service teams. The event agency must turn their combined requirements into one accurate and practical guest experience.
This guide explains how to plan a real estate project launch in 2026, including indicative budgets, site requirements, stage production, broker engagement, buyer lead capture, sample agendas, timelines, compliance considerations and a complete execution checklist.
Planning a Real Estate Launch Event in India?
Events Cookie provides end-to-end planning and production for residential, commercial and plotted-development launch events across India.
Our team can coordinate:
-
Event strategy and launch concept
-
Venue and project-site assessment
-
Open-ground infrastructure
-
Entry gates, décor and project branding
-
Stage, sound, lighting and LED screens
-
Project-model and display areas
-
Broker and channel-partner meets
-
Buyer registration and lead capture
-
VIP and investor hospitality
-
Project films and presentation support
-
Celebrity and artist booking
-
Corporate anchors, bands, singers and DJs
-
Catering, bars and trained service staff
-
Photography, videography and live camera feeds
-
Security, medical support and guest movement
-
Complete launch-day management
Call or WhatsApp: +91 9855555352
Email: contact@eventscookie.com
Website: www.eventscookie.com
Office: 6th Floor, C-205, Phase 8B, Industrial Area, Sector 74, Sahibzada Ajit Singh Nagar, Punjab – 140307
What Is a Real Estate Launch Event?
A real estate launch event is organised by a developer, builder or property company to introduce a new project, phase, tower, commercial development, plotted community or property experience to a selected audience.
The audience may include:
-
Prospective homebuyers
-
Property investors
-
Brokers
-
Channel partners
-
Real estate agents
-
Existing customers
-
Corporate buyers
-
Leasing partners
-
Banks and finance partners
-
Architects and consultants
-
Government or industry representatives
-
Media and content creators
-
Company leadership and employees
Depending on its purpose, the programme may be called a:
-
Property launch event
-
Real estate project launch
-
Builder launch event
-
Residential project launch
-
Commercial property launch
-
Channel partner launch
-
Broker meet
-
Investor preview
-
Sample apartment unveiling
-
Experience-centre opening
-
Phase or tower launch
-
Site inauguration
-
Possession or handover ceremony
Some launches focus on a formal presentation and project reveal. Others combine a site tour, sample-flat visit, broker briefing, entertainment, dinner and sales consultations.
The correct format should be selected according to the project’s readiness, audience and sales objective—not merely according to the available event budget.
Real Estate Launch Event Planning at a Glance
| Planning area | Important decision |
|---|---|
| Project status | Registration, approvals, construction readiness and approved marketing claims |
| Launch objective | Awareness, broker activation, qualified leads, site visits, bookings or phase announcement |
| Audience | Buyers, investors, brokers, VIPs, media, corporate clients or existing customers |
| Format | Project-site launch, hotel event, experience-centre opening, mall activation or hybrid programme |
| Guest count | Invited, confirmed, expected and safe working capacity |
| Site | Access road, parking, land condition, power, toilets, weather plan and construction separation |
| Production | Stage, LED, sound, lighting, playback, cameras, power and technical backup |
| Project experience | Model, sample apartment, floor plans, amenity displays, film and guided tour |
| Sales system | Registration, consent, lead qualification, sales assignment and follow-up |
| Hospitality | Welcome, seating, food, beverages, VIP service, help desk and departure assistance |
| Entertainment | Anchor, singer, band, DJ, celebrity appearance or launch performance |
| Compliance | RERA, advertising approval, fire, structural, electrical, music, sound, food and local permissions |
| Measurement | Attendance, qualified leads, site tours, appointments, bookings and cost per lead |
How Much Does a Real Estate Launch Event Cost in India in 2026?
There is no fixed price for organising a property launch. The cost depends heavily on whether the event is held inside a hotel, at a completed experience centre or on an undeveloped project site that requires flooring, tenting, power, lighting, toilets, access control and weather protection.
The following figures are broad planning estimates for professionally managed one-day real estate launch events in India.
Indicative Real Estate Launch Event Budget
| Number of guests | Indicative standard budget | Indicative premium budget |
|---|---|---|
| 100 guests | ₹7 lakh–₹12 lakh | ₹12 lakh–₹25 lakh or more |
| 250 guests | ₹12 lakh–₹24 lakh | ₹24 lakh–₹50 lakh or more |
| 500 guests | ₹22 lakh–₹45 lakh | ₹45 lakh–₹90 lakh or more |
| 1,000 guests | ₹40 lakh–₹80 lakh | ₹80 lakh–₹1.75 crore or more |
These estimates may include:
-
Basic venue or site preparation
-
Branded entrance and registration
-
Standard stage and décor
-
LED screen
-
Professional sound and lighting
-
Project-display area
-
Guest seating
-
Catering and beverages
-
Registration staff
-
Basic lead-capture setup
-
Corporate anchor
-
Standard entertainment
-
Photography and videography
-
Event manpower
-
Security and show-day coordination
They may exclude:
-
Celebrity artist fees
-
Major land levelling or civil work
-
Permanent experience-centre construction
-
Sample-apartment construction
-
Large structural tents or air-conditioned hangars
-
Extensive road development
-
Major landscaping
-
Luxury liquor
-
Buyer gifts
-
High-value broker incentives
-
Large-scale digital marketing
-
Chartered guest transport
-
Heavy weather structures
-
Multi-day events
-
Taxes and local authority charges
A detailed site inspection is essential before preparing the final quotation. Two events with the same guest count can have very different budgets when one is held in a hotel ballroom and the other on an open construction site.
Recommended Real Estate Launch Budget Allocation
An initial launch budget may be divided broadly as follows:
| Budget category | Typical share |
|---|---|
| Site preparation and temporary infrastructure | 10%–20% |
| Stage, sound, lighting, LED and power | 18%–28% |
| Branding, décor and project displays | 12%–20% |
| Catering and beverages | 15%–25% |
| Registration, hospitality and lead capture | 4%–9% |
| Marketing, invitations and content | 5%–12% |
| Entertainment and artist booking | 5%–20% |
| Security, medical support, manpower and permissions | 5%–10% |
| Contingency reserve | 8%–12% |
These ranges are not intended to total exactly 100% because every launch uses a different mix. Site infrastructure may become the largest expense at an undeveloped project. Entertainment may become the largest variable when the programme includes a celebrity.
Sample Budget for a 500-Guest Real Estate Launch
The following example represents a premium evening launch at a project site with professional production and moderate entertainment. Actual prices will vary by city, date and scope.
| Budget category | Indicative amount |
|---|---|
| Site preparation, power and temporary infrastructure | ₹6 lakh |
| Stage, LED, sound and lighting | ₹10 lakh |
| Décor, project branding and display areas | ₹7 lakh |
| Catering and beverages | ₹8 lakh |
| Anchor and entertainment | ₹4 lakh |
| Registration, lead capture and hospitality | ₹1.75 lakh |
| Photography, videography and approved aerial coverage | ₹1.50 lakh |
| Security, medical support, manpower and permissions | ₹2 lakh |
| Invitations, print material and launch content | ₹1.50 lakh |
| Contingency reserve | ₹4.75 lakh |
| Estimated total before taxes | ₹46.50 lakh |
A celebrity appearance, extensive temporary structures, air conditioning, luxury gifting or a major project-model reveal can increase the total substantially.
Major Real Estate Launch Cost Components
1. Site Preparation and Temporary Infrastructure
A project-site launch may require more groundwork than a hotel event.
The scope can include:
-
Land clearing
-
Compaction and safe temporary flooring
-
Carpet or weather-resistant floor covering
-
Access-road improvement
-
Dust control
-
Drainage preparation
-
Covered walkways
-
Temporary tent or hangar
-
Rain gutters and water discharge
-
Heating, cooling or ventilation
-
Guest toilets
-
Handwashing stations
-
Drinking-water points
-
Generator power
-
Electrical distribution
-
Floodlighting
-
Barricading
-
Construction-zone separation
-
Parking lighting
-
Back-of-house areas
-
Waste-management points
Do not assume that an empty plot is automatically event-ready. Uneven soil, loose cables, waterlogging, construction material and uncontrolled vehicle movement can create serious safety and operational problems.
2. Stage and Technical Production
The production setup may include:
-
Main stage
-
Branded scenic backdrop
-
Central LED screen
-
Side or relay screens
-
Project-presentation system
-
Playback computers
-
Backup laptop
-
Confidence monitor
-
Teleprompter
-
Podium
-
Wireless microphones
-
Professional sound system
-
Stage lighting
-
Audience lighting
-
Architectural lighting
-
Project-facade lighting
-
Moving lights
-
Follow spot
-
Launch-reveal mechanism
-
Live cameras
-
Recording
-
Communication headsets
-
Power distribution
-
Generator backup
The technical team should receive every film, presentation, logo animation and audio track before the event. All content should be tested on the actual LED system during the rehearsal.
3. Project Branding and Displays
Branding should explain the project—not merely decorate the venue.
The scope may include:
-
Approach-road signs
-
Main entrance gate
-
Project-name display
-
RERA and statutory information where applicable
-
Registration desk
-
Directional signage
-
Stage branding
-
Project master-plan wall
-
Location map
-
Site-development timeline
-
Tower or phase information
-
Floor-plan displays
-
Amenity displays
-
Material and finish samples
-
Project scale model
-
Sample-apartment signage
-
Sales lounge branding
-
Broker desk
-
Finance-partner desk
-
Media wall
-
Photo opportunity
-
Table branding
-
Brochures and folders
-
QR codes linked to approved information
All prices, areas, specifications, possession dates, approvals, visuals and project claims should be checked by the developer’s authorised legal and marketing teams before production.
4. Catering and Beverages
The catering budget can include:
-
Welcome drinks
-
Tea and coffee
-
Snacks
-
Live counters
-
Buffet dinner
-
Desserts
-
Soft beverages
-
Water service
-
VIP service
-
Broker lounge refreshments
-
Artist and crew meals
-
Bar service where permitted
-
Service staff
-
Crockery and glassware
-
Kitchen or pantry setup
-
Waste disposal
At an open site, the catering team may need a temporary kitchen, water supply, drainage, fire-safe cooking area, refrigeration and protected food storage.
5. Guest Registration and Lead Capture
The registration system may include:
-
RSVP database
-
QR invitations
-
Name-based check-in
-
Broker codes
-
Walk-in registration
-
Badge printing
-
Buyer-interest form
-
Consent or notice mechanism
-
Lead-source tagging
-
Sales-executive assignment
-
Site-tour scheduling
-
Meeting appointments
-
Feedback form
-
CRM export
The system should remain simple enough to prevent queues. Collect only the information genuinely required for sales follow-up and event operations.
6. Entertainment and Launch Moment
Possible entertainment options include:
-
Corporate anchor
-
Live band
-
Sufi singer
-
Punjabi or Bollywood performer
-
Celebrity singer
-
DJ
-
Dance troupe
-
Percussion act
-
Mentalist
-
Instrumental ensemble
-
Celebrity appearance
-
Light-and-sound reveal
-
Project-film premiere
-
Scale-model unveiling
-
Facade illumination
Entertainment should support the project positioning. A luxury development may require a refined live experience, while a high-energy launch for a large plotted community may use a popular regional performer.
7. Photography, Video and Content
The content scope may include:
-
Project-launch film
-
Leadership film
-
Construction-progress film
-
Location film
-
Customer story
-
Project animation
-
Presentation graphics
-
Launch countdown
-
Social-media clips
-
Event photography
-
Guest interviews
-
Broker testimonials
-
Live camera feed
-
Approved drone coverage
-
Same-day edit
-
Post-event highlight film
Renderings and animations should match the developer’s approved project information and contain the necessary disclaimers.
8. Event Team, Security and Hospitality
A professional project launch may require:
-
Event director
-
Project manager
-
Site manager
-
Production manager
-
Show caller
-
Stage manager
-
Registration manager
-
CRM or lead-desk team
-
Sales-team coordinator
-
Broker coordinator
-
VIP manager
-
Artist manager
-
Backstage team
-
Guest-relations executives
-
Ushers
-
Parking coordinators
-
Security personnel
-
Traffic marshals
-
Technical crew
-
Catering supervisors
-
Housekeeping
-
Medical-support personnel
-
Fire-safety personnel where required
Each person should receive a written duty, reporting point, timing and escalation contact.
Define the Objective Before Designing the Event
The launch objective should be written in one sentence and approved by the leadership team.
For example:
“To introduce the new residential project to 300 prospective buyers and 150 channel partners, communicate its verified advantages and generate qualified site-visit and sales appointments within seven days.”
The objective should answer:
-
What exactly is being launched?
-
Which audience matters most?
-
What information must they understand?
-
What action should they take?
-
How will the sales team follow up?
-
Which metrics will define success?
A launch designed for brokers will differ from a consumer launch. Brokers may need inventory, commercial terms, sales tools and account-manager access. Buyers may need project clarity, financing information, site tours and individual consultations.
Common Types of Real Estate Launch Events
Residential Project Launch
Suitable for introducing apartments, villas, floors or residential communities.
The experience may focus on:
-
Location advantages
-
Master plan
-
Home configurations
-
Amenities
-
Construction schedule
-
Sample apartment
-
Payment information
-
Finance support
-
Buyer consultation
Commercial Property Launch
Suitable for offices, retail developments, mixed-use projects, warehouses or business parks.
The programme may include:
-
Market and catchment information
-
Leasing or investment proposition
-
Floor plates
-
Footfall or connectivity information
-
Tenant mix
-
Business amenities
-
Facility-management plan
-
Investor or occupier meetings
Plotted-Development Launch
A plotted-development event may require detailed maps, plot categories, infrastructure plans and guided site movement.
The site should clearly distinguish event areas from roads, open trenches, construction equipment and restricted land.
Broker and Channel-Partner Launch
This is a business-focused programme for real estate agents and distribution partners.
It may include:
-
Project training
-
Inventory briefing
-
Sales-process explanation
-
Marketing material
-
Channel-partner registration
-
Relationship manager introductions
-
Question-and-answer session
-
Recognition or entertainment
For more information about the wider business-event format, see our Dealer Meet Planning in India guide.
Investor Preview
An investor preview is normally smaller and more controlled. It may include leadership access, a detailed financial presentation, private consultation areas and scheduled appointments.
All investment-related statements should be approved by the developer’s legal and finance teams.
Experience-Centre or Sample-Apartment Opening
The guest journey may include:
-
Welcome and registration
-
Project overview
-
Scale-model viewing
-
Guided sample-apartment visit
-
Material and finish display
-
Sales consultation
-
Refreshments
-
Follow-up appointment
Timed tours can prevent congestion inside smaller sample apartments.
Phase, Tower or Inventory Launch
An existing development may organise a focused event for a new phase, tower, category or limited inventory release.
The communication should make the new offering clear without confusing it with earlier phases.
Choosing the Right Launch Format
Project-Site Launch
Best for:
-
Showing the actual location
-
Guided site tours
-
Sample-apartment visits
-
Scale and infrastructure demonstrations
-
Creating buyer confidence through physical experience
Challenges:
-
Weather
-
Dust and uneven land
-
Limited power
-
Temporary toilets
-
Construction safety
-
Parking and traffic
-
Higher infrastructure cost
Hotel or Convention-Centre Launch
Best for:
-
Premium presentations
-
Controlled production
-
Investor or broker events
-
Launches before the site is guest-ready
-
Strong catering and hospitality
Challenges:
-
Guests cannot experience the project directly
-
Transport may be needed for later site visits
-
Project displays must work harder to explain the development
Experience-Centre Launch
Best for:
-
Smaller high-intent groups
-
Repeated launch sessions
-
Sample-apartment tours
-
Private buyer meetings
Challenges:
-
Limited capacity
-
Possible congestion
-
Requirement for timed entry
-
Limited entertainment space
Mall or Public Activation
Best for:
-
Brand awareness
-
Lead generation
-
Model and virtual-tour displays
-
Reaching local buyers
Challenges:
-
Shorter attention span
-
Venue restrictions
-
Limited sales privacy
-
Need for rapid lead qualification
Hybrid or Multi-City Launch
Best for:
-
Investor audiences in several cities
-
Remote channel partners
-
National corporate leasing teams
-
Simultaneous internal and external communication
The technical plan should include reliable connectivity, audio feeds, backup internet, platform moderation and recording permissions.
How to Assess a Project Site
The site should be reviewed by event, construction, facilities, security and safety representatives before finalising the layout.
Access and Arrival
Check:
-
Distance from the nearest main road
-
Road condition
-
Vehicle turning radius
-
Coach and VIP vehicle access
-
Entry and exit separation
-
Gate width
-
Traffic congestion
-
Street lighting
-
Directional signage
-
Emergency-vehicle access
Ground Condition
Inspect:
-
Level differences
-
Loose soil
-
Mud or waterlogging risk
-
Open pits or trenches
-
Construction debris
-
Underground services
-
Drainage route
-
Flooring requirement
-
Tent anchoring restrictions
-
Accessible pathways
Power and Technical Access
Confirm:
-
Available electrical load
-
Generator locations
-
Cable routes
-
Earthing
-
Distribution panels
-
Backup power
-
Fuel-management plan
-
Production-vehicle access
-
Lighting for parking and pathways
Guest Facilities
Plan:
-
Registration space
-
Seating
-
Sales lounge
-
VIP lounge
-
Accessible toilets
-
General toilets
-
Drinking water
-
First-aid or medical room
-
Prayer or quiet room where appropriate
-
Cloakroom
-
Lost-and-found point
-
Waste collection
Construction Separation
Guests should not enter active or unsafe construction areas. Use approved barriers, warning signs, security personnel and clearly marked guided routes.
Any site tour should be reviewed for lighting, floor condition, head clearance, edges, temporary stairs, lift access and emergency evacuation.
Indicative Space Plan for a 500-Guest Site Launch
The following figures are broad planning references, not architectural or engineering specifications.
| Event zone | Indicative area |
|---|---|
| Entrance, security and registration | 1,500–2,500 sq. ft. |
| Main audience seating | 6,000–8,000 sq. ft. |
| Stage, technical control and camera positions | 2,500–4,000 sq. ft. |
| Project model and experience displays | 1,500–3,000 sq. ft. |
| Sales and consultation lounge | 1,500–3,000 sq. ft. |
| VIP lounge | 800–1,500 sq. ft. |
| Catering and dining | 4,000–6,000 sq. ft. |
| Kitchen, storage and service backend | 2,000–4,000 sq. ft. |
| Toilets, medical and operational support | Scope-based |
| Parking and vehicle circulation | Site-specific |
The final area depends on seating style, stage size, food service, site tours, local fire requirements, accessible routes and emergency access.
Plan the Guest Journey
A successful launch should feel simple to the guest even when the backend is complex.
1. Invitation
The guest receives:
-
Event date and timing
-
Project and developer name
-
Accurate location
-
Google Maps link
-
Parking information
-
Dress guidance where relevant
-
RSVP link
-
Contact number
-
Approved project and statutory information
2. Arrival
The arrival plan may include:
-
Approach-road signage
-
Security check
-
Valet or directed parking
-
Broker and buyer lanes
-
VIP drop-off
-
Registration
-
Welcome drink
-
Badge or guest identification
-
Help desk
3. Project Discovery
Guests may experience:
-
Project model
-
Location display
-
Amenity zone
-
Virtual tour
-
Sample material display
-
Guided site visit
-
Sample apartment
-
Sales consultation
4. Main Launch
The central programme may include:
-
Opening film
-
Leadership address
-
Project presentation
-
Approved reveal moment
-
Customer or partner message
-
Question-and-answer session
-
Entertainment
5. Sales Conversation
After the main reveal, guests should be able to:
-
Meet a sales representative
-
Compare approved configurations
-
Request a site tour
-
Schedule a follow-up meeting
-
Speak to an authorised finance representative
-
Receive approved project material
6. Departure and Follow-Up
The team should record:
-
Guest attendance
-
Lead source
-
Project interest
-
Assigned sales executive
-
Follow-up date
-
Site-visit request
-
Feedback
The departure experience may also include valet coordination, safe pedestrian routes, gifts and transport support.
Invitation and Pre-Launch Marketing Plan
The launch campaign should attract the correct audience rather than only producing a large attendance number.
Buyer Invitations
Possible channels include:
-
Existing enquiry database
-
Email
-
WhatsApp communication
-
Phone outreach
-
Digital invitations
-
Landing page
-
Local digital advertising
-
Outdoor media
-
Print invitations
-
Referral communication
Broker and Channel-Partner Outreach
Consider:
-
Broker database verification
-
Relationship-manager calls
-
Personal invitations for leading partners
-
Regional WhatsApp groups
-
Project teaser material
-
Attendance confirmation
-
Transport support where necessary
-
Separate broker briefing pack
Reminder Schedule
A practical reminder flow may include:
-
Save the date
-
Formal invitation
-
Confirmation request
-
One-week reminder
-
One-day reminder
-
Event-day map and contact message
Avoid sending excessive messages. Every communication should have a clear purpose and use only approved project information.
How to Plan Buyer and Broker Registration
Create separate categories where this improves service:
-
Prospective buyer
-
Existing customer
-
Broker or channel partner
-
Investor
-
Corporate buyer
-
Media
-
VIP
-
Employee
-
Vendor
The registration form may ask for:
-
Full name
-
Mobile number
-
Email address
-
City
-
Guest category
-
Broker company and registration details where relevant
-
Preferred property configuration
-
Approximate purchase timeline
-
Site-visit interest
-
Communication preference
-
Necessary privacy notice or consent mechanism
Do not collect identity documents, financial details or sensitive information merely because the form can accommodate them. The developer should approve the exact data fields, access permissions, retention period and CRM process.
Lead-Capture and Sales Follow-Up System
The event should produce an organised sales pipeline—not a spreadsheet of unqualified phone numbers.
Recommended Lead Fields
-
Guest ID
-
Registration status
-
Lead source
-
Buyer or broker category
-
Project configuration of interest
-
Budget range where voluntarily provided
-
Purchase timeline
-
Site-tour request
-
Assigned sales executive
-
Priority
-
Follow-up date
-
Meeting outcome
-
Booking status
Lead Assignment
Decide before the event:
-
How leads will be divided
-
Which team handles brokers
-
Which team handles direct buyers
-
Who handles VIPs and investors
-
How duplicate leads will be resolved
-
How walk-ins will be recorded
-
How quickly the first follow-up will occur
Post-Launch Follow-Up
A practical process may include:
-
Thank-you message within 24 hours
-
Requested brochure or information
-
Assigned representative introduction
-
Site-visit confirmation
-
Sales call within the approved response window
-
Lead-status update
-
Broker relationship-manager follow-up
-
Seven-day launch-performance review
The sales and legal teams should control project representations, payment discussions and booking documentation.
Project Presentation Content
The central presentation should be concise and evidence-based.
Possible sections include:
-
Developer introduction
-
Project vision
-
Location and connectivity
-
Master plan
-
Product configurations
-
Amenities
-
Architecture and design
-
Sustainability features
-
Construction status
-
Approved development timeline
-
Customer experience
-
Sales process
-
Next steps
Avoid filling the presentation with long paragraphs. Use readable maps, diagrams, verified numbers, clear visuals and one approved source of project information.
Every presentation, film, brochure, stage graphic and anchor script should use the same approved terminology.
Real Estate Launch Stage Design
The stage should support the business presentation and reveal moment.
Indicative Stage Sizes
| Guest count | Indicative stage size | Indicative main LED screen |
|---|---|---|
| 100–200 | 24 × 12 ft or 30 × 12 ft | 16 × 8 ft to 20 × 10 ft |
| 250–500 | 40 × 20 ft or 48 × 24 ft | 24 × 12 ft to 32 × 16 ft |
| 500–1,000 | 60 × 24 ft or 60 × 30 ft | 32 × 16 ft to 48 × 18 ft |
| More than 1,000 | 80 × 30 ft or larger | Main screen with side or relay screens |
These dimensions are indicative planning references, not engineering specifications. The final design must consider the venue, ground, wind, weather, screen load, sightlines, performers, cameras and structural approvals.
Functional Stage Requirements
Consider:
-
Leadership entrance
-
Presenter positions
-
Podium location
-
Product or model reveal
-
Accessible stage route
-
Entertainment space
-
Screen visibility
-
Confidence monitor
-
Camera sightlines
-
Safe steps
-
Edge markings
-
Backstage access
-
Green room
-
Technical control
-
Emergency exit route
-
Concealed and protected cables
Do not approve a design only because it looks impressive in a three-dimensional render. Confirm that it can be engineered, installed, rehearsed and operated safely at the selected site.
Launch-Reveal Ideas
The reveal should make the project easier to understand or remember.
Suitable ideas include:
-
Project-film premiere
-
Scale-model unveiling
-
LED content reveal
-
Architectural lighting reveal
-
Sample-apartment opening
-
Master-plan reveal
-
Leadership countdown
-
Light-and-sound sequence
-
Interactive screen presentation
-
Approved aerial or site film
-
Customer or channel-partner testimonial
Avoid reveal concepts that:
-
Make unapproved claims
-
Depend on unsafe machinery
-
Produce excessive smoke near guests
-
Block emergency routes
-
Risk damaging the model or property
-
Create long delays
-
Require permissions that have not been secured
Sample Real Estate Launch Event Agenda
The following programme can be adapted for a 300- to 500-guest evening launch.
| Time | Programme |
|---|---|
| 4:30 p.m. | Guest arrival, registration and refreshments |
| 5:00 p.m. | Project-model viewing and guided experience-centre tours |
| 5:45 p.m. | Main seating opens |
| 6:00 p.m. | Anchor welcome and safety information |
| 6:10 p.m. | Leadership address |
| 6:25 p.m. | Project film |
| 6:35 p.m. | Project presentation |
| 7:00 p.m. | Official launch and reveal moment |
| 7:15 p.m. | Buyer and broker question-and-answer session |
| 7:35 p.m. | Guided site or sample-apartment tours resume |
| 7:45 p.m. | Entertainment performance |
| 8:30 p.m. | Dinner and sales consultations |
| 9:15 p.m. | Scheduled buyer and broker meetings continue |
| 10:00 p.m. | Closing announcement and departure support |
The agenda should be adjusted to local sound restrictions, daylight, weather, site-tour safety and the project’s sales process.
Broker Preview and Consumer Launch on the Same Day
A two-session format can work when the information and guest flow are carefully separated.
Afternoon Broker Preview
-
Partner registration
-
Project training
-
Inventory and process briefing
-
Sales-material distribution
-
Question-and-answer session
-
Relationship-manager meetings
-
Site tour
Evening Buyer Launch
-
Buyer registration
-
Project discovery
-
Leadership presentation
-
Launch reveal
-
Entertainment
-
Dinner
-
Sales consultations
Allow enough reset time between sessions. Broker-only commercial information should not remain visible during the consumer programme unless approved.
VIP, Investor and Media Management
VIP Guests
Plan:
-
Confirmed arrival time
-
Vehicle access
-
Named host
-
Private holding area
-
Stage or seating position
-
Security protocol
-
Approved speaking role
-
Departure route
Investors and Corporate Buyers
Provide:
-
Quiet consultation area
-
Scheduled meeting slot
-
Authorised commercial representative
-
Approved project documents
-
Follow-up responsibility
Media and Content Creators
Prepare:
-
Accreditation process
-
Media desk
-
Approved press note
-
Spokesperson schedule
-
Interview area
-
Photography positions
-
Project fact sheet
-
Embargo or publication instructions where required
-
Content-usage permissions
Only authorised representatives should answer legal, financial, construction or project-approval questions.
Weather and Contingency Planning
Outdoor property launches should have a written weather plan.
Review:
-
Rain probability
-
Wind conditions
-
Heat or cold
-
Dust
-
Drainage
-
Lightning risk
-
Tent rating and anchoring
-
LED and electrical protection
-
Covered guest paths
-
Alternative indoor space
-
Evacuation route
-
Food protection
-
Parking recovery plan
-
Decision deadline for activating the backup plan
The contingency budget should not be treated as spare money for decorative additions. It should remain controlled for operational changes and genuine emergencies.
Real Estate Launch Planning Timeline
16–24 Weeks Before the Event
-
Confirm project readiness
-
Review launch and advertising approvals
-
Define the event objective
-
Identify the target audience
-
Estimate guest count
-
Approve the initial budget
-
Select the city and format
-
Assess project-site suitability
-
Shortlist alternative venues
-
Confirm leadership availability
-
Identify launch-date risks
12–16 Weeks Before the Event
-
Appoint the event management company
-
Finalise the venue or project site
-
Conduct the first technical survey
-
Develop the launch concept
-
Prepare the initial layout
-
Define the buyer and broker journeys
-
Plan the registration and CRM process
-
Shortlist the anchor and entertainment
-
Begin project-film and presentation planning
-
Identify required permissions
8–12 Weeks Before the Event
-
Finalise the event identity
-
Approve stage and branding direction
-
Confirm the production scope
-
Confirm the anchor and artist
-
Begin invitation development
-
Prepare the guest database
-
Develop the lead form
-
Confirm the project-model display
-
Plan the sales lounge
-
Shortlist catering
-
Conduct the safety review
-
Begin vendor contracting
4–8 Weeks Before the Event
-
Release save-the-date communication
-
Approve the project presentation
-
Complete the major project films
-
Finalise the site layout
-
Confirm temporary infrastructure
-
Approve the menu
-
Start attendance tracking
-
Confirm VIPs and media
-
Prepare broker communication
-
Finalise staffing
-
Confirm security and medical support
-
Review all statutory information
2–4 Weeks Before the Event
-
Freeze the main agenda
-
Conduct the final site walkthrough
-
Confirm the expected attendance
-
Prepare badges and guest categories
-
Finalise stage graphics
-
Test the CRM workflow
-
Finalise sales-executive assignments
-
Confirm the site-tour route
-
Prepare scripts and pronunciation notes
-
Test all presentation files
-
Review parking and traffic movement
-
Finalise weather contingencies
Final Week
-
Reconfirm every vendor
-
Check site readiness
-
Recheck power and generator plans
-
Print approved signage and material
-
Share team duty charts
-
Brief sales and event teams together
-
Confirm VIP movement
-
Inspect temporary structures
-
Verify emergency exits
-
Confirm medical support
-
Conduct technical rehearsals
-
Test registration and backup processes
-
Monitor the weather
Event Day
-
Open the production and control desks early
-
Complete structural, electrical and fire checks
-
Test sound, LED, lighting and playback
-
Walk the complete guest route
-
Inspect registration counters
-
Test lead assignment
-
Brief security, parking and hospitality teams
-
Confirm catering safety and service timing
-
Rehearse leadership and reveal cues
-
Check the green room
-
Monitor capacity and guest movement
-
Record operational issues and decisions
Within 24–72 Hours After the Event
-
Send approved thank-you communication
-
Assign and verify every lead
-
Confirm requested site visits
-
Share approved project information
-
Follow up with channel partners
-
Publish approved photographs and video
-
Prepare attendance and lead reports
-
Review budget variance
-
Record safety or technical incidents
-
Conduct an internal debrief
Complete Real Estate Launch Event Checklist for 2026
Strategy and Project Approval
-
Project launch objective approved
-
Target audience defined
-
Project readiness confirmed
-
Launch date approved
-
Guest-count estimate approved
-
Budget approved
-
RERA and advertising review completed where applicable
-
Approved project fact sheet prepared
-
Internal decision-makers identified
-
Event management partner appointed
-
Success metrics defined
Venue and Project Site
-
Venue or site confirmed
-
Working capacity verified
-
Site survey completed
-
Ground condition inspected
-
Construction zones separated
-
Access road reviewed
-
Parking capacity confirmed
-
VIP drop-off approved
-
Emergency access maintained
-
Accessible routes prepared
-
Drainage reviewed
-
Temporary toilets arranged
-
Water supply confirmed
-
Waste plan prepared
-
Weather backup approved
Guest Data and Invitations
-
Buyer database cleaned
-
Broker database cleaned
-
Guest categories defined
-
Mobile numbers verified
-
Email addresses verified
-
Save-the-date sent
-
Invitations approved
-
RSVP form active
-
Google Maps link checked
-
Attendance confirmations tracked
-
VIP list approved
-
Media list approved
-
Accessibility requests collected
-
Dietary requirements collected
Marketing and Event Content
-
Launch identity approved
-
Project claims legally reviewed
-
Statutory information checked
-
RERA details displayed where applicable
-
Project presentation approved
-
Project film approved
-
Master-plan graphics approved
-
Floor plans approved
-
Location map approved
-
Amenity displays approved
-
Brochures approved
-
Anchor script approved
-
Leadership speeches collected
-
Media note approved
-
Social-media plan approved
Registration and Sales
-
Registration system tested
-
QR invitations tested
-
Walk-in process prepared
-
Broker-code process prepared
-
Lead form approved
-
Privacy notice or consent process reviewed
-
Sales executives assigned
-
Lead-allocation rules approved
-
Site-visit scheduling prepared
-
Consultation tables arranged
-
Finance desk confirmed
-
Approved documents available
-
Backup offline lead form prepared
-
Follow-up timeline approved
Stage and Technical Production
-
Stage design approved
-
Structural review completed
-
LED-screen size approved
-
Sound system approved
-
Lighting plan approved
-
Power load confirmed
-
Generator backup confirmed
-
Podium arranged
-
Wireless microphones arranged
-
Presentation laptop arranged
-
Backup laptop arranged
-
Confidence monitor arranged
-
Playback system tested
-
Camera plan approved
-
Communication headsets arranged
-
Launch-reveal mechanism tested
-
Technical rehearsal scheduled
Branding and Project Experience
-
Approach-road signs prepared
-
Entrance gate approved
-
Registration branding approved
-
Directional signage prepared
-
Stage graphics approved
-
Project-model area prepared
-
Location map installed
-
Master-plan display installed
-
Floor-plan displays installed
-
Amenity information installed
-
Sample material display prepared
-
Sample-apartment route checked
-
Sales lounge branded
-
Broker desk branded
-
Media wall prepared
-
Photo area created
Catering and Hospitality
-
Menu approved
-
Menu tasting completed
-
Kitchen or pantry plan approved
-
Food-business documentation reviewed
-
Vegetarian meals confirmed
-
Jain meals confirmed where required
-
Allergy information reviewed
-
Welcome drinks arranged
-
Water service arranged
-
VIP service plan prepared
-
Broker lounge refreshments arranged
-
Service-staff strength confirmed
-
Crew meals arranged
-
Waste and cleaning plan prepared
Entertainment and Artists
-
Anchor contract signed
-
Artist contract signed
-
Travel booked
-
Hotel booked
-
Technical rider received
-
Hospitality rider received
-
Green room prepared
-
Performance duration approved
-
Music permissions reviewed
-
Artist-security plan prepared
-
Payment schedule approved
-
Backup entertainment sequence prepared
Safety, Security and Compliance
-
Local permissions identified
-
Fire-safety requirements reviewed
-
Temporary structures inspected
-
Electrical safety checked
-
Emergency exits marked
-
Evacuation route prepared
-
Crowd-capacity plan approved
-
Security team confirmed
-
Parking and traffic team confirmed
-
Medical assistance arranged
-
Emergency contacts prepared
-
Sound restrictions confirmed
-
Music rights reviewed
-
Drone requirements reviewed
-
Alcohol requirements confirmed
-
Insurance requirements reviewed
-
Weather monitoring assigned
Event-Day Operations
-
Control room active
-
Team attendance checked
-
Duty chart distributed
-
Radios or communication system active
-
Registration opened on time
-
Sales desk ready
-
Guest route inspected
-
VIP route inspected
-
Site-tour route inspected
-
Project displays cleaned
-
Catering timeline confirmed
-
Show cues rehearsed
-
Capacity monitored
-
Incident log maintained
-
Departure desk active
Post-Launch
-
Thank-you messages sent
-
Leads assigned
-
Site visits scheduled
-
Broker follow-up completed
-
Attendance report prepared
-
Lead-quality report prepared
-
Photographs delivered
-
Highlight video delivered
-
Approved content published
-
Expenses reconciled
-
Vendor payments reviewed
-
Safety and incident report completed
-
Sales-conversion review scheduled
-
Internal debrief completed
-
Improvement points documented
Permissions and Compliance for Real Estate Launch Events in India
Requirements depend on the project, state, city, site, event format, music, alcohol service, temporary structures, guest count and marketing activity.
RERA and Project Advertising
The Real Estate (Regulation and Development) Act, 2016 states that a promoter cannot advertise, market, book, sell, offer for sale or invite purchasers to a real estate project that requires registration before that project is registered. The Act also requires relevant advertisements or prospectuses to mention the authority’s website address and the project registration number, along with other prescribed information. Review the official Real Estate (Regulation and Development) Act, 2016 and the applicable state or Union Territory RERA rules and directions.
Punjab RERA similarly states that promoters must register applicable commercial and residential projects before advertising, marketing, booking or selling them. See RERA Punjab services for promoters.
Before publishing invitations, films, digital ads, brochures, maps, prices, returns, possession dates or project visuals, obtain written approval from the developer’s authorised legal and marketing teams.
Temporary Structures, Fire and Crowd Safety
Outdoor launches may involve temporary stages, tents, barricades, kitchens, generators and electrical distribution. Their design and approval requirements vary locally.
The National Disaster Management Authority’s crowd-management guidance identifies capacity planning, risk assessment, structural safety, fire and electrical safety, signage, emergency medical services, transport and incident response as important parts of event planning. See the NDMA guide for managing crowds at events and mass gatherings.
Obtain qualified structural and electrical reviews and written confirmation from the relevant venue, project, fire and local authorities.
Music Licensing
Commercial launch events using live, recorded or DJ music may require permission for the rights involved.
The Indian Performing Right Society provides licensing options for live, DJ and recorded music used at events. IPRS licensing information
PPL India states that an event licence applies to the use of sound recordings within the repertoire it controls during an event and is distinct from an annual background-music licence. PPL India licensing FAQ
The contract should identify whether the developer, venue, event organiser, DJ or artist representative is responsible for obtaining the required permissions.
Sound and Local Permissions
The Central Pollution Control Board’s Noise Pollution Rules state that loudspeakers and public-address systems require written permission from the relevant authority and generally restrict their use at night, subject to the rules and permitted exceptions. CPCB Noise Pollution Rules
Confirm the permitted sound level, event timing and closing time with the local administration and venue.
Food Safety
Use a properly licensed hotel or caterer. Confirm safe food preparation, storage, transport, water, temporary-kitchen operation and service procedures. FSSAI publishes sector guidance and checklists for catering operations. FSSAI food-business guidance
Drone Photography
Drone photography should only be planned after checking the current airspace, equipment, operator and permission requirements. Project sites near airports, defence areas or restricted airspace may have additional limitations. Review the Ministry of Civil Aviation’s Drone Rules, 2021 and the current Digital Sky requirements.
Alcohol
Alcohol permissions and service rules are state-specific. Confirm whether the venue or project site can legally serve alcohol, whether a temporary permit is required, which supplier may provide it, the permitted service time and the applicable age-verification process.
Traffic and Parking
A major project launch can affect public roads and neighbouring properties. Confirm requirements for road signage, vehicle holding, valet operations, traffic marshals, coach movement and police or local-authority coordination.
Emergency and resident access should never be blocked.
Lead Data, Photography and Privacy
Registration and sales systems may collect personal data. Review what information is collected, the lawful purpose, the notice or consent process where applicable, who can access the data, how it is secured and how long it will be retained.
Privacy planning should consider India’s Digital Personal Data Protection Act, 2023 and the notified Digital Personal Data Protection Rules, 2025.
Photography notices and publication approvals should be reviewed for guests, employees, VIPs and children attending the event.
Taxes and Vendor Documentation
Ask suppliers whether their quotations include or exclude applicable taxes. Collect proper contracts, invoices, registrations and insurance documents where required. Confirm the current tax treatment with qualified finance professionals and official CBIC GST information.
This section provides general event-planning information and is not legal, engineering, aviation, taxation or licensing advice. Obtain case-specific written guidance from the developer’s legal team, the venue, qualified professionals and the relevant authorities.
How to Measure Real Estate Launch Success
Measure both event execution and commercial outcomes.
Useful metrics include:
-
Number of invited guests
-
RSVP rate
-
Actual attendance
-
Buyer attendance
-
Broker attendance
-
Walk-in registrations
-
Qualified leads
-
Cost per qualified lead
-
Project-model visits
-
Sample-apartment visits
-
Site-tour requests
-
Sales consultations
-
Follow-up appointments
-
Broker registrations
-
Brochure or information requests
-
Finance-desk enquiries
-
Bookings or expressions of interest recorded by the authorised sales team
-
Lead-response time
-
Seven-day follow-up completion
-
Thirty- and ninety-day conversion, where appropriate
-
Guest feedback
-
Broker feedback
-
Media coverage
-
Approved digital-content engagement
-
Programme timing
-
Budget variance
-
Technical incidents
-
Safety incidents
-
Hospitality complaints
Do not judge the complete event only by the crowd size, celebrity performance or number of photographs. A smaller launch that produces qualified conversations and well-managed follow-up may deliver greater business value.
Common Real Estate Launch Event Mistakes
Launching Before the Site Is Guest-Ready
Loose soil, dust, debris, open trenches and poor lighting can damage buyer confidence and create safety risks.
Treating RERA and Advertising Review as a Last-Minute Task
Project claims, prices, visuals, timelines and statutory information should be reviewed before invitations and event content enter production.
Inviting Everyone Without Segmentation
Buyers, brokers, investors, media and VIPs have different information and service needs.
Spending Heavily on the Stage but Ignoring Sales Areas
A beautiful stage cannot replace clear project displays, trained representatives, private consultation tables and a reliable lead system.
Creating Registration Queues
Long forms and insufficient counters can delay the programme and create a poor first impression.
Having No Offline Backup
Internet connectivity may fail at a project site. Prepare offline registration, printed contact sheets, backup devices and a later synchronisation process.
Using Inconsistent Project Information
The presentation, brochure, film, model labels, anchor script and sales material should use the same approved facts.
Overloading the Agenda
Guests do not need several long speeches. Keep the project message focused and preserve time for tours and sales conversations.
Ignoring Parking and Departure
A smooth programme can still end badly if guests wait for vehicles or encounter dark, muddy or congested exits.
Weak Weather Planning
Outdoor launches require a defined rain, wind, heat and electrical-protection plan.
Skipping Technical Rehearsals
Project films, launch reveals, microphones and leadership presentations should be tested before the audience enters.
No Lead-Ownership Process
Leads lose value when sales representatives do not know who should follow up or when duplicate records remain unresolved.
Why Choose Events Cookie for Real Estate Launch Event Planning?
Real estate launches require event production, brand understanding, site logistics and sales coordination. The programme must look premium while communicating the project accurately and guiding guests towards a clear next step.
Events Cookie can manage the complete launch, including:
-
Event strategy and launch concept
-
Project-site and venue assessment
-
Event budgeting
-
Open-ground infrastructure
-
Stage, décor and project branding
-
Sound, lighting and LED screens
-
Project-model and experience areas
-
Project-film and presentation coordination
-
Buyer and broker registration
-
Lead-capture planning
-
Sales-lounge setup
-
VIP and media hospitality
-
Celebrity and artist booking
-
Singers, bands, anchors and DJs
-
Catering, bars and service staff
-
Security, parking and guest movement
-
Photography and video production
-
Vendor and permission coordination
-
Complete launch-day execution
Instead of coordinating separate site, décor, production, catering, artist, registration, security and hospitality vendors, the developer receives one coordinated event-management plan.
Plan Your 2026 Real Estate Launch with Events Cookie
Whether you are planning a 100-person investor preview, a 500-guest residential launch or a 1,000-person project-site celebration, Events Cookie can help develop the right concept, budget, site plan, production and guest journey.
Call or WhatsApp: +91 9855555352
Email: contact@eventscookie.com
Website: www.eventscookie.com
Office address: 6th Floor, C-205, Phase 8B, Industrial Area, Sector 74, Sahibzada Ajit Singh Nagar, Punjab – 140307
For a more accurate proposal, share:
-
Project name and location
-
Preferred launch date
-
Residential, commercial or plotted project
-
Project and RERA status
-
Venue or site status
-
Expected guest count
-
Buyer, broker, investor and VIP split
-
Site readiness
-
Stage and production expectations
-
Project-model and display requirements
-
Entertainment preference
-
Food and bar requirements
-
Estimated budget
Frequently Asked Questions
How much does a real estate launch event cost in India?
A professionally managed 100-guest property launch may begin at approximately ₹7 lakh. A premium 500-guest site launch may cost ₹45 lakh–₹90 lakh or more, while a major open-ground or celebrity-led programme can exceed ₹1 crore. Site preparation, temporary structures, production, catering and entertainment significantly affect the cost.
How early should a real estate project launch be planned?
Begin approximately four to six months in advance for a large project-site launch. A smaller hotel or experience-centre event may require less time, but project approvals, content, production and guest outreach should not be rushed.
What is the best venue for a property launch?
A project site is valuable when it is safe and ready for guests. A hotel or convention centre may be better when the site is under construction or lacks suitable access, parking, power, toilets and weather protection.
What should a real estate launch event include?
A complete launch may include invitations, registration, project displays, scale model, project film, leadership presentation, official reveal, site tours, sample-apartment visits, sales consultations, catering, entertainment and post-event lead follow-up.
Is a real estate launch different from a regular product launch?
Yes. A property launch normally involves project approvals, statutory information, a physical site or model, buyer and broker segmentation, sales consultations and longer follow-up. A general product launch may focus more heavily on media demonstration and immediate product experience.
Can a broker meet and buyer launch be held on the same day?
Yes. A broker preview can be organised earlier, followed by a buyer event. The agendas, access, commercial information, registration categories and sales teams should be clearly separated.
What stage size is suitable for a 500-person real estate launch?
A stage around 40 × 20 ft to 48 × 24 ft may work for many 500-person launches. The final dimensions depend on the LED screen, venue, reveal mechanism, entertainment, camera positions, ground and safety requirements.
Can Events Cookie organise an open-ground property launch?
Yes. Events Cookie can coordinate temporary flooring, structures, power, lighting, toilets, parking, branding, production, catering, security, medical support and guest management, subject to site conditions and local approvals.
Can Events Cookie arrange a celebrity for a project launch?
Yes. Events Cookie can coordinate singers, Bollywood or Punjabi performers, comedians, anchors and other celebrities, subject to availability, commercial terms, travel, security, hospitality and technical requirements.
How should leads be captured at a property launch?
Use a registration and CRM process that records the guest category, lead source, approved interest fields, assigned sales executive, site-visit request and follow-up date. Maintain an offline backup for locations with unreliable internet.
Does a project launch require RERA registration?
If the project is required to be registered under the applicable RERA framework, it should not be advertised, marketed, booked or offered for sale before registration. The developer’s legal team should confirm the project-specific requirements and approve all launch communication.
Which permissions may be required?
Requirements can include venue or land approval, fire and structural review, electrical safety, sound permission, music rights, food-safety documentation, traffic coordination, drone compliance and alcohol permission. The exact requirements depend on the location and event format.
Can the launch be live-streamed?
Yes. Live streaming can be arranged for remote investors, channel partners or company teams. The plan should include reliable internet, backup connectivity, cameras, audio feeds, platform access and content permissions.
Can Events Cookie manage buyer registration and broker hospitality?
Yes. Registration counters, guest categorisation, broker desks, VIP hospitality, sales-lounge coordination and lead-capture support can be included in the event-management scope.
Can Events Cookie organise real estate launch events anywhere in India?
Yes. Events Cookie can plan residential, commercial, plotted-development, broker, investor and experience-centre launches across India, subject to project readiness, dates, site conditions and local requirements.
Editorial, Budget and Compliance Disclaimer
The budget figures in this guide are indicative 2026 planning estimates, not fixed tariffs, vendor quotations or guaranteed market prices. Actual costs vary according to the city, date, site, venue, guest count, infrastructure, production design, catering, entertainment, weather plan, taxes and supplier availability.
Stage and space dimensions are general planning references and must not be treated as architectural, structural or engineering specifications. Temporary structures, stages, LED screens, rigging, electrical systems and crowd capacities should be reviewed by qualified professionals and approved by the relevant venue and authorities.
Project advertising, RERA, permissions and compliance requirements vary according to the project, state, city, site and event format. Confirm all legal, real estate, taxation, music, alcohol, food-safety, fire-safety, privacy, aviation, insurance, sound and local requirements with qualified professionals and the relevant authorities before the event.
Artists
DJs
Comedians
Music Bands
Live Musicians
Dancers & Choreographers
Anchors & Hosts (Emcees)
Influencers & Content Creators
Wedding Planners
Decor & Design
Sound & Lighting
Venues
Logistics & Rentals
Caterers
Makeup Artists
Photographers & Videographers
Fashion Designers
Wedding Wear
Jewellery
Hospitality Staff